亚洲www,亚洲av色福免费网站,农村老女人久久毛片免费看,日韩av无码中文一区二区三区

咨詢熱線

13913683786

當(dāng)前位置:首頁  >  技術(shù)文章  >  電阻層析成像模塊應(yīng)用案例-基于生成對抗網(wǎng)絡(luò)的地鐵盾構(gòu)超前探測方法研究

電阻層析成像模塊應(yīng)用案例-基于生成對抗網(wǎng)絡(luò)的地鐵盾構(gòu)超前探測方法研究

更新時間:2023-12-01      點擊次數(shù):514

 

電阻層析成像模塊

  基于生成對抗網(wǎng)絡(luò)的地鐵盾構(gòu)超前探測方法研究

  Research on Advanced Detection Method of Metro Shield Machine Based on Generative Adversarial Networks

  背景介紹

  Background

  盾構(gòu)機(簡稱TBM)以其施工安全的gao xiao特點被廣泛應(yīng)用于地鐵隧道建設(shè)中,TBM施工過程中經(jīng)常會出現(xiàn)預(yù)料不到的塌方、突涌水等地質(zhì)災(zāi)害,這嚴重影響工程的進展,增加工程的造價。本文案采用聚焦直流電法超前探測技術(shù),以TBM前方不良地質(zhì)體的反演成像作為目標,引入生成對抗網(wǎng)絡(luò)算法 。

  Shield boring machine (TBM) is widely used in subway tunnel construction with its safe and efficient construction characteristics, and unexpected geological disasters such as landslides and water inrushes often occur during TBM construction, which seriously affects the progress of the project and increases the cost of the project. In this paper, the advanced detection technology of focused direct current method is adopted, and the generative adversarial network algorithm is introduced by taking the inversion imaging of bad geological bodies in front of TBM as the goal

  關(guān)鍵技術(shù)1:聚焦直流電法盾構(gòu)超前探測技術(shù)

  The focused direct current (DC) electrical method for advance detection in shield tunneling

  關(guān)鍵技術(shù)2:二維有限元正演模擬

  Two-dimensional finite element forward simulatio

  關(guān)鍵技術(shù)3:基于相似性原理的物理模型實驗

  Physical model experiments based on the principle of similarity

 

 

 


聯(lián)系方式

郵箱:360009931@qq.com

地址:蘇州市吳中區(qū)開發(fā)區(qū)旺山工業(yè)園興東路31號

咨詢熱線

139-1368-3786

(周一至周日9:00- 19:00)

在線咨詢
  • 微信公眾號

  • 移動端瀏覽

Copyright©2024 蘇州拓測儀器設(shè)備有限公司 All Right Reserved    備案號:蘇ICP備19005910號-2    sitemap.xml
技術(shù)支持:化工儀器網(wǎng)    管理登陸